Running
Label
- Description
Description
28/311: Nylon Polymerisation Plant: 100 + 40 MT/Day
Plant was built in 1998/1999.
Runs two separate lines for a combined 140 Metric Tons per Day for a combined 49,280 Metric Tons per Year, or 60,000 KTPY.
LINE No. 1, 100 MT / Day
This plant was designed and is operated to make Nylon 6 Polymer in chip form. This unit was originally designed to produce 100 metric tons per day of polymer.
LINE No. 2, 40 MT / Day
This plant was designed and is operated to produce Nylon 6 Polymer in chip form. The unit was designed to produce 40 Metric Tons per Day of Polymer.
Status: Closed Recently